
An embedded photo is a copy stored inside the Affinity Photo 2 document, so editing the external original does not update that copy. A linked resource keeps an external-file relationship and can be updated through Resource Manager. First inspect the placement type before replacing a photo that appears out of date.
Key Takeaways
- Embedded content is portable but does not track later source-file edits.
- Linked content depends on its external file and update state.
- Make Linked saves the embedded content out to a chosen location; verify that path before editing it.
Check the actual placement, not the filename
The official Embedding vs linking reference explains where the data resides. An embedded file has no continuing source link. A linked file remains on disk outside the document.
A hypothetical portrait layout may contain a photograph called “approved portrait” while another file with a similar name is being retouched in a separate folder. The visible name does not prove the layout follows that external file.
Open Resource Manager and identify the placed resource. Record whether it is embedded or linked and which source location the linked version uses. This is different from linked layer attributes, which concern connections among layer properties inside the editing structure.
Decide whether the layout should update
Embedding can be appropriate when an approved layout must travel with its current image data. An embedded copy remaining unchanged after an external edit can therefore be correct behavior.
Choose a linked workflow when later source revisions should be incorporated deliberately. That choice brings a dependency: the linked file itself is not stored inside the document, and moving or renaming it can require locating it again.
Preserve the accepted embedded version before changing the arrangement. An update relationship should serve the revision plan rather than replace an approved snapshot accidentally.
Convert with an explicit destination
To change an embedded resource into a linked one, open Window > Resource Manager, select it and choose Make Linked. The documented operation asks for a folder where the embedded file will be saved out.
Verify that resulting path. Do not assume Make Linked has automatically selected whichever external original you happened to edit earlier. The next modification must concern the actual linked file, not another similarly named copy.
Update the linked resource through Resource Manager when appropriate. The documentation also describes automatic updating as an application setting; choose that behavior deliberately when an approved layout should respond to external changes.
Test the intended revision relationship
On copies, make an identifiable, reversible source revision and check whether the linked layout receives it through the chosen update process. Retain the approved embedded version as the fixed comparison if the job needs both states.
Accept the workflow when the source path, placement type and update behavior agree with the brief. The example is a proposed dependency check, not a report of testing a particular storage system.
Related tasks
- How Do I Change One Linked Affinity Photo 2 Layer Without Breaking Every Link?
- Why Are Images Missing When Someone Else Opens My InDesign or Photoshop Project?
- Why Are Fonts Still Missing After I Collect Affinity Photo 2 Resources?
Sources and scope
- Embedding vs linking: Official documentation for the controls and limits discussed above.
Official desktop documentation research; no hands-on testing, search-volume or citation-rate claims. Any example or diagnostic procedure is proposed editorial guidance.
Prepared by Imagild Editorial, the company editorial team responsible for these guides. AI assisted research and drafting. This is documentation-based guidance with proposed examples, not a claim of hands-on testing or an independent product review. Report a correction.
Cover: AI-generated conceptual editorial illustration; not a real application screenshot, observed output or before-and-after test.